Skip to main content
Prints and Wall Art since 2004
sales@mediastorehouse.com
Tel: (678) 701-8254
Home > All Images > 2021 > December > 1 Dec 2021

Images Dated 1st December 2021

Choose from 124 pictures in our Images Dated 1st December 2021 collection for your Wall Art or Photo Gift. All professionally made for Quick Shipping.


Joining deck units JLP01_11_60071_08 Featured 1 Dec 2021 Image

Joining deck units JLP01_11_60071_08

Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking west from the top of a bridge pylon during the construction of the Second Severn Crossing, showing a space awaiting a deck unit to connect the sections of the bridge and Wales with England.
The Second Severn Crossing took four years to build and was a joint civil engineering project between Laing Civil Engineering and the French company GTM. The work started in April 1992 and the opening ceremony later took place on 5th June 1996. The crossing is a cable-stayed bridge which stretches over 5000 metres across the River Severn, 3 miles downstream from the Severn Bridge which opened in 1966

© Historic England Archive. John Laing Photographic Collection

Deck launch gantry JLP01_11_60006_03 Featured 1 Dec 2021 Image

Deck launch gantry JLP01_11_60006_03

Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of bridge deck units being installed during the construction of the Second Severn Crossing, showing a specially designed launch gantry overhead and two workers standing inside one of the deck units.
The Second Severn Crossing took four years to build and was a joint civil engineering project between Laing Civil Engineering and the French company GTM. The work started in April 1992 and the opening ceremony later took place on 5th June 1996. The crossing is a cable-stayed bridge which stretches over 5000 metres across the River Severn connecting England and Wales, 3 miles downstream from the Severn Bridge which opened in 1966

© Historic England Archive. John Laing Photographic Collection

Steel liner for the dome JLP01_10_49262 Featured 1 Dec 2021 Image

Steel liner for the dome JLP01_10_49262

SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Looking south-east towards the reactor building on the construction site of Sizewell B Nuclear Power Station, showing three sections of steel liner for the reactor dome in the foreground.
Sizewell B is one of two nuclear power stations on the Suffolk coast near the village of Sizewell. Sizewell A, its predecessor, is in the process of being decommissioned. Sizewell B is a Pressurised Water Reactor (PWR); the first of its kind to be constructed in the UK. John Laing plc were awarded the contract for the main civil engineering work on 19th May 1987. Sizewell B was completed in 1995, after 8 years of construction, and is operated by EDF Energy

© Historic England Archive. John Laing Photographic Collection